Hoping to have a big day up the hill this Saturday as I have a big list of jobs, most of which are short;
• Install the section of boardwalk I’ve pre-made into boardwalk in stage 1 of Snakes n Ladders
• Stabilise the first skinny of The Third Place
• Mesh over the duck pond hoses
• Install some sections of drain-coil and gravel
• Cut and dig in revised finish line for TTP
• Make roll-over/ skinny stunt for The Green Mile entrance
• Possibly tidy up the Double Barrel stunt exit in stage 2 of S n L
I’ll be up there from 10:00 till I get it all done. I have tools and materials (though I’ll have to grab some out for the end of TGM too)
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest ℗ 2000-2008 by Tama Easton.
Extra design ℗ by Scotty Lane and Nathan Whitley. Photos and written work on this site are property of their owners, do not use them for commercial purposes.
Developed for Microsoft Internet Explorer 7.0 and Mozilla Firefox 3.0