| View previous topic :: View next topic |
| Author |
Message |
SherylPeril Unsoiled


Joined: Oct 01, 2007 Posts: 11 Location: Dunners
|
|
|
|
| Back to top |
|
 |
luvin_dh Ridden


Joined: Jan 26, 2007 Posts: 149 Location: Oamaru/ Dunedin
|
Posted: Thu 12th Jun 5:08pm Post subject: |
 |
|
|
is there going to be anymore working parties?. I am away for uni holidays at the moment but would have been very keen to help
|
|
|
|
| Back to top |
|
 |
Bulletproofpenguin Worn


Joined: Oct 09, 2006 Posts: 858 Location: Floating on 10 inches of travel
|
Posted: Thu 12th Jun 7:22pm Post subject: |
 |
|
i will try to get there
|
|
|
|
| Back to top |
|
 |
YakinAway Worn


Joined: Sep 17, 2004 Posts: 940 Location: dunedin
|
Posted: Thu 12th Jun 9:11pm Post subject: |
 |
|
|
should be there... might be able to grab sme tools to cathc ya's there
|
|
|
|
| Back to top |
|
 |
SherylPeril Unsoiled


Joined: Oct 01, 2007 Posts: 11 Location: Dunners
|
Posted: Thu 19th Jun 9:49pm Post subject: Thanks For All The Keen Helpers Last Weekend At Signal Hill! |
 |
|
We had a really good session on Saturday, with about 20 people turning
up to help - twice as many people as we were expecting. Cheers everyone! (Some pics below).
We only discovered at a meeting the day before that we were allowed to build the main DH exit track on the open face of the hill above the earth works, so we couldn't get straight into building as we had to design it first! This meant a bit of standing around and thinking but at least everyone had a say in the design! We are now planning on the best time to get a digger and operator up there to create the masterpiece.
We had about 3 groups working on different areas. We laid shingle paths across the top playing field and across the top of the filled area for bikers to make their way down from the 4wd road. We also erected a wire mesh fence at the bottom of the 4WD road as well as one down the side of the bank near the exit of the DH track. Hopefully the fences will stop people riding down the newly sewn grass banks.
We installed a couple of sign posts at the corner of the top playing field so that the MTB signs can be mounted directing riders to take the shingle track that bypasses the school and not ride through the school grounds.
A group of riders started work on the alternative section of track through the trees dropping onto the top field. This section is looking quite steep so the plans are to make an easier route through here as well to cater for riders of different abilities.
Yes, we will have another working party probably in the next 2- 3 weeks to dig in finalised track designs which will be marked out prior to the day. Until then the things to remember are:
-If you want to help out, that's awesome but wait until an official work party, or contact Sheryl or Fin with suggestions.
- All track work must be approved by club representatives. Contacts are Sheryl Macleod 027 2778408, Fin O'Conner 027 6117334 and Hamish Seaton 0274426474.
- Club representatives will consult DCC / Arboretum / School about new
works.
-Working parties will be posted here on Vorb.
Thanks again everyone. It is going to be primo when it's all finished!
Sheryl
|
|
| Description: |
|
| Filesize: |
93.53 KB |
| Viewed: |
548 Time(s) |

|
| Description: |
|
| Filesize: |
93.49 KB |
| Viewed: |
548 Time(s) |

|
| Description: |
|
| Filesize: |
58.69 KB |
| Viewed: |
548 Time(s) |

|
| Description: |
|
| Filesize: |
97.55 KB |
| Viewed: |
548 Time(s) |

|
| Description: |
|
| Filesize: |
111.18 KB |
| Viewed: |
548 Time(s) |

|
| Description: |
|
| Filesize: |
86.09 KB |
| Viewed: |
548 Time(s) |

|
|
| Back to top |
|
 |
|